Hi,
I was wondering if anyone on the list had tried to use the Perforce SCM
system along with Eventum, using the Perforce P4DTI, their interface for bug
tracking systems. P4DTI supports integration with Bugzilla; Bugzilla uses
MySQL as its database; Eventum uses MySQL as its database. Essentially,
P4DTI allows the integrator to map fields between the Perforce database and
the bug tracking system, and then uses that information to provide a common
interface within Perforce. Anyway, with that commonality, I'm thinking that
this might work, but was wondering if anyone else had tried this yet.
Any help would be appreciated.